{"id":26542,"date":"2026-10-14T06:23:32","date_gmt":"2026-10-14T06:23:32","guid":{"rendered":"https:\/\/aydem.com.tr\/hizmet\/orta-gerilim\/"},"modified":"2026-10-15T17:22:10","modified_gmt":"2026-10-15T14:22:10","slug":"orta-gerilim","status":"publish","type":"hizmet","link":"https:\/\/aydem.com.tr\/en\/hizmet\/orta-gerilim\/","title":{"rendered":"Medium Voltage Facilities"},"content":{"rendered":"<p class=\"lead wp-block-paragraph\">In large buildings such as factories, residential complexes, shopping malls and hospitals, we build the medium voltage network from the connection point specified by the distribution company to the building's transformers.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Scope of Service<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>MV underground cable routing, trenching and cable laying<\/li>\n\n<li>Cable terminations, joints and connections<\/li>\n\n<li>Installation of MV switchgear (incoming, outgoing, metering, protection)<\/li>\n\n<li>Ring networks and multiple transformer feeds<\/li>\n\n<li>Insulation and VLF tests, phase sequence checks<\/li>\n\n<li>Energisation and distribution company acceptance<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">How We Work<\/h2>\n\n\n\n<ol class=\"wp-block-list ayd-steps\">\n<li>Connection opinion and route survey<\/li>\n\n<li>Design and permit processes (including excavation permits)<\/li>\n\n<li>Cable and switchgear installation<\/li>\n\n<li>Tests and measurements<\/li>\n\n<li>Energisation and acceptance<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Regulations and Standards<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Regulation on Electrical Heavy Current Installations<\/li>\n\n<li>Regulation on Earthing in Electrical Installations<\/li>\n\n<li>Regulation on Electrical Installation Projects<\/li>\n\n<li>Regulation on Acceptance of Electrical Installations<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Sample Projects<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"\/en\/proje\/cemil-kacar\/\">Cemil Ka\u00e7ar Factory<\/a> (LV-MV works) \u00b7 <a href=\"\/en\/proje\/netlog\/\">Netlog<\/a> (0.4 MVA power supply)<\/p>\n\n\n\n<p class=\"ayd-note wp-block-paragraph\">This service is part of our <a href=\"\/en\/faaliyet-alanlari\/\">fields of activity<\/a> . For a site survey and quotation, <a href=\"\/en\/iletisim\/\">contact us<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>MV cable laying from the distribution company's connection point to new transformers, switchgear, connections and commissioning.<\/p>","protected":false},"featured_media":0,"menu_order":1,"template":"","class_list":["post-26542","hizmet","type-hizmet","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/hizmet\/26542","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/hizmet"}],"about":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/types\/hizmet"}],"wp:attachment":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/media?parent=26542"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}