{"id":26549,"date":"2026-10-14T06:23:32","date_gmt":"2026-10-14T06:23:32","guid":{"rendered":"https:\/\/aydem.com.tr\/hizmet\/kabul-teknik-destek\/"},"modified":"2026-10-15T17:22:10","modified_gmt":"2026-10-15T14:22:10","slug":"kabul-teknik-destek","status":"publish","type":"hizmet","link":"https:\/\/aydem.com.tr\/en\/hizmet\/kabul-teknik-destek\/","title":{"rendered":"Acceptance and Technical Support"},"content":{"rendered":"<p class=\"lead wp-block-paragraph\">Delivering electrical work is only complete once its acceptance is obtained. We manage the entire process required for the installation to be accepted by the authorities and handed over to the client with its documents, and we remain at your side after handover.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Scope of Service<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Acceptance applications to the distribution company and relevant authorities<\/li>\n\n<li>Pre-acceptance test and measurement reports<\/li>\n\n<li>Provisional and final acceptance procedures<\/li>\n\n<li>Handover with as-built drawings, test reports and operating documents<\/li>\n\n<li>Periodic maintenance, fault repair and technical support<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">How We Work<\/h2>\n\n\n\n<ol class=\"wp-block-list ayd-steps\">\n<li>Preparing the acceptance file<\/li>\n\n<li>Authority applications and site inspections<\/li>\n\n<li>Rectifying deficiencies and acceptance<\/li>\n\n<li>Handover and maintenance plan<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Regulations and Standards<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Regulation on Acceptance of Electrical Installations<\/li>\n\n<li>Regulation on Electrical Internal Installations<\/li>\n\n<li>Regulation on Electrical Heavy Current Installations<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-note wp-block-paragraph\">This service is part of our <a href=\"\/en\/faaliyet-alanlari\/\">fields of activity<\/a> . For a site survey and quotation, <a href=\"\/en\/iletisim\/\">contact us<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Obtaining provisional and final acceptance from the authorities, handover with documents, maintenance and technical support.<\/p>","protected":false},"featured_media":0,"menu_order":8,"template":"","class_list":["post-26549","hizmet","type-hizmet","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/hizmet\/26549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/hizmet"}],"about":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/types\/hizmet"}],"wp:attachment":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/media?parent=26549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}