{"id":26650,"date":"2026-10-15T17:22:02","date_gmt":"2026-10-15T14:22:02","guid":{"rendered":"https:\/\/aydem.com.tr\/faaliyet-alanlari\/"},"modified":"2026-10-15T17:22:02","modified_gmt":"2026-10-15T14:22:02","slug":"faaliyet-alanlari","status":"publish","type":"page","link":"https:\/\/aydem.com.tr\/en\/faaliyet-alanlari\/","title":{"rendered":"Fields of Activity"},"content":{"rendered":"<p class=\"lead wp-block-paragraph\">An electrical installation covers everything in a building starting from the transformer: panels, cables, cable support systems, lighting, sockets, motor feeds, generator and UPS transfers, and low-current systems. Aydem Elektrik undertakes all of these components, both as new installations in new buildings and as renovation and capacity upgrades in existing buildings.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. High and Medium Voltage<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Receiving energy from the distribution grid and converting it to the voltage suitable for the building.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building-type, modular (kiosk) and pole-mounted transformer substations<\/li>\n\n<li>MV switchgear, MV cable laying, cable terminations and joints<\/li>\n\n<li>Energy permits, connection agreements and design approval processes with the distribution company<\/li>\n\n<li>Testing, commissioning and provisional\/final acceptance by the distribution company<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Related services: <a href=\"\/en\/hizmet\/yuksek-gerilim\/\">High Voltage Works<\/a> \u00b7 <a href=\"\/en\/hizmet\/orta-gerilim\/\">Medium Voltage Facilities<\/a>. Examples: <a href=\"\/en\/proje\/hursultan-a-s\/\">H\u00fcrsultan A.\u015e.<\/a> 2,000 kVA, <a href=\"\/en\/proje\/flex-tronics-corlu-tekirdag\/\">Flex Tronics \u00c7orlu<\/a> and <a href=\"\/en\/proje\/art-metal\/\">Art Metal<\/a> 1,600 kVA transformer substations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Low Voltage and Power Distribution<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Safe distribution of energy from the transformer output to the end user.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Main distribution (MDB), sub-distribution, floor and apartment panels; meter panels<\/li>\n\n<li>Cable trays, ladder-type supports and trunking systems<\/li>\n\n<li>Socket, lighting and mechanical (motor) feeds<\/li>\n\n<li>Internal installations in residential, shopping mall, factory, hospital and metro projects<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Related service: <a href=\"\/en\/hizmet\/alcak-gerilim\/\">Low Voltage Applications<\/a>. Examples: <a href=\"\/en\/proje\/pruva-34\/\">Pruva 34<\/a>, <a href=\"\/en\/proje\/martim-e-5\/\">MART\u0130M E-5<\/a>, <a href=\"\/en\/proje\/netlog-bursa-depo\/\">NETLOG Bursa Warehouse<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">3. Standby Power and Power Factor Correction<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Diesel generator sets and automatic transfer (ATS) panels<\/li>\n\n<li>Uninterruptible power supply (UPS) feeds<\/li>\n\n<li>Reactive power compensation: correction panels that reduce grid losses and reactive energy penalties<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Examples: <a href=\"\/en\/proje\/hursultan-a-s\/\">H\u00fcrsultan A.\u015e.<\/a> 1,000 kVA generator transfer set; <a href=\"\/en\/proje\/flex-tronics-corlu-tekirdag\/\">Flex Tronics<\/a> power factor correction and generator transfer sets.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4. Lighting Systems<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>General, fa\u00e7ade and outdoor lighting; decorative lighting<\/li>\n\n<li>Emergency and exit lighting<\/li>\n\n<li>Lighting control and automation<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Examples: <a href=\"\/en\/proje\/netlog\/\">Netlog<\/a> decorative lighting and lighting automation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Low-Current Systems<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fire detection and alarm systems<\/li>\n\n<li>Public address and voice evacuation<\/li>\n\n<li>Data and telephone infrastructure (structured cabling)<\/li>\n\n<li>CCTV camera systems<\/li>\n\n<li>Door entry \/ video door entry<\/li>\n\n<li>Central satellite and TV distribution<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Related service: <a href=\"\/en\/hizmet\/zayif-akim\/\">Low-Current Systems<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">6. Protection Systems<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Foundation and ring earthing, equipotential bonding<\/li>\n\n<li>Lightning conductors and lightning protection systems<\/li>\n\n<li>Surge protection and residual current protection<\/li>\n\n<li>Earthing measurements and reporting<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Related service: <a href=\"\/en\/hizmet\/topraklama\/\">Earthing &amp; Lightning Protection<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">7. Panel Manufacturing and Automation<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>LV distribution, meter, power factor correction and motor control panels<\/li>\n\n<li>MV and low-current panels<\/li>\n\n<li>Factory, smart building and industrial automation systems<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Related services: <a href=\"\/en\/hizmet\/pano-imalati\/\">Switchboard Manufacturing<\/a> \u00b7 <a href=\"\/en\/hizmet\/otomasyon\/\">Automation Systems<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">8. Engineering, Acceptance and Technical Support<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Site survey, quantity take-off and tender engineering<\/li>\n\n<li>Electrical design: short-circuit, voltage drop, lighting and earthing calculations<\/li>\n\n<li>Construction site power installation<\/li>\n\n<li>Obtaining provisional and final acceptance from the authorities, delivery of as-built drawings<\/li>\n\n<li>Post-handover maintenance and technical support<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-related wp-block-paragraph\">Related services: <a href=\"\/en\/hizmet\/proje-muhendislik\/\">Design and Engineering<\/a> \u00b7 <a href=\"\/en\/hizmet\/kabul-teknik-destek\/\">Acceptance and Technical Support<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sectors We Serve<\/h2>\n\n\n\n<div class=\"wp-block-group ayd-cards ayd-cards--3\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-group ayd-card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Warehousing and Logistics<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Amazon Ankara Warehouse, NETLOG Bursa, Netlog Esenyurt and Afyon, PolarXP, ICL Kartal, Ernak Warehouse<\/p>\n\n\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group ayd-card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Industry and Factories<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">H\u00fcrsultan, Flex Tronics \u00c7orlu, Art Metal, Has\u00e7elik, CK Paslanmaz, Kiper Tekstil, Cemil Ka\u00e7ar Factory<\/p>\n\n\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group ayd-card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Residential and Mixed-Use Projects<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pruva 34, Bah\u00e7e\u015fehir Park, TOYA NEXT, Bah\u00e7e\u015fehir Konaklar\u0131, MART\u0130M E-5, K\u0131y\u0131 \u0130stanbul \u2013 Marina<\/p>\n\n\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group ayd-card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Commercial and Shopping Malls<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Florentia Village \u2013 Kamp\u00fcs \u0130stanbul, Bah\u00e7e\u015fehir G\u00f6let, Ka\u015f\u0131beyaz K\u0131y\u0131 \u0130stanbul, Olive Hill, Lateral Coffee<\/p>\n\n\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group ayd-card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Education and Public<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">T\u00fcrgev Ba\u015fak\u015fehir Girls' Dormitory and Mosque, IMM Beylikd\u00fcz\u00fc Kindergarten \u2013 Yuvam\u0131z \u0130stanbul<\/p>\n\n\n<\/div><\/div>\n\n\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Regulations and Standards We Apply<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Regulation on Electrical Internal Installations<\/li>\n\n<li>Regulation on Electrical Heavy Current Installations<\/li>\n\n<li>Regulation on Earthing in Electrical Installations<\/li>\n\n<li>Regulation on Electrical Installation Projects and Regulation on Acceptance of Electrical Installations<\/li>\n\n<li>Regulation on Fire Protection of Buildings (fire detection and emergency lighting)<\/li>\n\n<li>TS EN 61439 (LV panels), TS EN 62305 (lightning protection), TS HD 60364 (LV installations)<\/li>\n<\/ul>\n\n\n\n<p class=\"ayd-note wp-block-paragraph\">For a site survey and quotation for your project, <a href=\"\/en\/iletisim\/\">contact us<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>All components of the electrical installation, from the transformer to the end user, under a single contract and a single responsibility.<\/p>","protected":false},"author":4,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-26650","page","type-page","status-publish","hentry"],"jetpack-related-posts":[],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/pages\/26650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/comments?post=26650"}],"version-history":[{"count":0,"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/pages\/26650\/revisions"}],"wp:attachment":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/media?parent=26650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}