{"id":26504,"date":"2026-10-12T12:27:11","date_gmt":"2026-10-12T12:27:11","guid":{"rendered":"https:\/\/aydem.com.tr\/proje\/ticarethane-basaksehir\/"},"modified":"2026-10-14T06:54:37","modified_gmt":"2026-10-14T06:54:37","slug":"ticarethane-basaksehir","status":"publish","type":"proje","link":"https:\/\/aydem.com.tr\/en\/proje\/ticarethane-basaksehir\/","title":{"rendered":"Ticarethane Ba\u015fak\u015fehir"},"content":{"rendered":"<h2>Ticarethane Ba\u015fak\u015fehir<\/h2>\n<table width=\"283\">\n<tbody>\n<tr>\n<td width=\"110\"><b><strong>Project Name<\/strong><\/b><\/td>\n<td width=\"7\"><b><strong>:<\/strong><\/b><\/td>\n<td width=\"158\">Ticarethane Ba\u015fak\u015fehir<\/td>\n<\/tr>\n<tr>\n<td width=\"110\"><b><strong>Location<\/strong><\/b><\/td>\n<td width=\"7\"><b><strong>:<\/strong><\/b><\/td>\n<td width=\"158\">Ba\u015fak\u015fehir \/ Istanbul<\/td>\n<\/tr>\n<tr>\n<td width=\"110\"><b><strong>Construction Area<\/strong><\/b><\/td>\n<td width=\"7\"><b><strong>:<\/strong><\/b><\/td>\n<td width=\"158\">54,231 m<sup>2<\/sup><\/td>\n<\/tr>\n<tr>\n<td width=\"110\"><b><strong>Residential Area<\/strong><\/b><\/td>\n<td width=\"7\"><b><strong>:<\/strong><\/b><\/td>\n<td width=\"158\">Commercial Units: 135<\/td>\n<\/tr>\n<tr>\n<td width=\"110\"><\/td>\n<td width=\"7\"><\/td>\n<td width=\"158\"><\/td>\n<\/tr>\n<tr>\n<td width=\"110\"><\/td>\n<td width=\"7\"><\/td>\n<td width=\"158\"><\/td>\n<\/tr>\n<tr>\n<td width=\"110\"><\/td>\n<td width=\"7\"><\/td>\n<td width=\"158\"><\/td>\n<\/tr>\n<tr>\n<td width=\"110\"><\/td>\n<td width=\"7\"><\/td>\n<td width=\"158\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 class=\"vc_custom_heading vc_custom_1460986003522\">About the Project<\/h2>\n<div class=\"wpb_text_column wpb_content_element vc_custom_1462626534572\">\n<div class=\"wpb_wrapper\">\n<div class=\"wpb_text_column wpb_content_element\">\n<div class=\"wpb_wrapper\">\n<p>Located right next to \u0130kitelli OSB, T\u00fcrkiye\u2019s largest organised industrial zone employing around 250,000 people, T\u0130CARETHANE BA\u015eAK\u015eEH\u0130R has 135 independent units and a total construction area of 54,231 m\u00b2. Thanks to the option of combining units, unit sizes can meet every need.<\/p>\n<p>&nbsp;<\/p>\n<p>The project includes workshops, technical areas, a shelter, a car park, storage, a grey water tank, a rainwater tank, a generator and a prayer room. The shops have a ceiling height of 7 metres and a column span of 8 metres.<\/p>\n<p>https:\/\/www.akyapi.com.tr\/projeler\/ticarethane-basaksehir<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ticarethane Ba\u015fak\u015fehir Proje Ad\u0131 : Ticarethane Ba\u015fak\u015fehir Yeri : Ba\u015fak\u015fehir \/ \u0130stanbul \u0130n\u015faat Alan\u0131 : 54.231 m2 Konut Alan\u0131 : Ticari \u00dcnite:\u2026<\/p>","protected":false},"featured_media":26353,"menu_order":12,"template":"","proje_durum":[269],"class_list":["post-26504","proje","type-proje","status-publish","has-post-thumbnail","hentry","proje_durum-tamamlanan"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/proje\/26504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/proje"}],"about":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/types\/proje"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/media\/26353"}],"wp:attachment":[{"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/media?parent=26504"}],"wp:term":[{"taxonomy":"proje_durum","embeddable":true,"href":"https:\/\/aydem.com.tr\/en\/wp-json\/wp\/v2\/proje_durum?post=26504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}